The first operation of our LIEBHERR LTM 1030-2.1 anniversary crane during the construction of a prefabricated house in timber construction on behalf of Theodor Roreger GmbH & Co. KG
Constructing an underwater pipeline below the Rhine-Herne Canal
The existing gas and oxygen pipeline of the pipe bridge was replaced with an underwater pipeline installed by our Gottwald AK 450 and Liebherr LTM 1400.